Case
project2012.9.6 ■Water supply and drainage system ■Fire protection system ■Full Heat Exchanger Control ■Thermostatic air conditioning box control ■Connected small air blower ■VRV air conditioner external unit ■Chiller unit system ■Pump and smoke extractor control ■Parking Garage ventilation system |
2014.10.13~2022.2.10 ■Continuous maintenance |
其他相關案例
Yongkang Mercedes-Benz Taiwan
Service Time: 2013 (Continuing Service)
Place: Tainan
Songshan Cultural and Creative Park
Service Time: 2012 (Continuing Service)
Place: Taipei
Fubon Financial-Sinyi Dist A10
Service Time: 2011 (Continuing Service)
Place: Taipei
Vellavita Shopping Mall
Service Time: 2008 (Continuing Service)
Place: Taipei
Taipei Bus Station
Service Time: 2007 (Continuing Service)
Place: Taipei
Miramar Shopping Mall
Service Time: 2005 (Continuing Service)
Place: Taipei