Case
projectTaipei Medical University Shuang Ho Hospital
Place: New Taipei City
2009.7.27 ■Continuous maintenance |
2011.3.25 ■Constant temperature air conditioning box system |
2011.5.18 ■Constant temperature air conditioning box system |
2012.8.22 ■Exhaust fan addition |
2013.5.06 ■Host System Control ■VAV BOX control ■Small Blower Control ■Thermostatic air conditioning box control ■Cabinet air conditioning box control ■Full Heat Exchanger Control ■Pre-cooling air conditioning box control ■General supply and exhaust fan control ■Parking Garage ventilation system ■Constant temperature and humidity air conditioning box control |
2017.3.20 ■Constant temperature and humidity air conditioning box |
2018.12.19 ■Replacing of the control system of the operating room and chilled water host |
2019.5.10 ■Addition of air conditioning box |
2021.6.08 ■Continuous maintenance |
其他相關案例
MacKay Memorial Hospital-Taitung
Service Time: 2012 (Continuing Service)
Place: Tai-Tung
Women and Children Hospital
Service Time: 2011 (Continuing Service)
Place: Taipei
Taoyuan Hospital
Service Time: 2006 (Continuing Service)
Place: Taoyuan
Saint Mary's Hospital Luodong
Service Time: 2005 (Continuing Service)
Place: Yilan
Cathay General Hospital
Service Time: 2010 (Continuing Service)
Place: Taipei
National Taiwan University Hospital
Service Time: 2013 (Continuing Service)
Place: Taipei
Level Biotechnology Inc
Service Time: 2006 (Continuing Service)
Place: New Taipei City
Institute Of Cellular And Organismic Biology
Service Time: 2006 (Continuing Service)
Place: Taipei
Animal Health Research Institute COA
Service Time: 2004 (Continuing Service)
Place: New Taipei City Tamsui
Country sanitary institute laboratory
Service Time: 2006 (Continuing Service)
Place: Hsinchu
Taipei City Hospital Heping Branch
Service Time: 2003 (Continuing Service)
Place: Taipei