Case
project2004.~2005. ■Continuous maintenance |
2010.1.4 ■Process system ■Power system ■Clean room air conditioning system |
2010.5.7 ■Process system ■Power system ■Dry Cooling Coil system ■Clean room air conditioning system |
2010.8.10 ■AHU air conditioning box control |
2012.5.7~2012.8.22 ■Continuous maintenance |
2012.9.3 ■Add SMS sending module |
2013.5.21 ■PCW additional |
2014.5.8 ■Dry Cooling Coil additional |
2015.4.23 ■Cooling Tower Control ■Chilled water host monitoring system |
2015.5.8 ■Continuous maintenance |
2015.5.25 ■Process system ■Exhaust fan system ■Dry Cooling Coil system ■Clean room air conditioning system |
2016.6.14 ■Added pump control |
2016.10.17 ■Continuous maintenance |
2017.3.13 ■Dry Cooling Coil system |
2017.8.2 ■B1F adds air compressor control ■Added exhaust fan control on 3F ■Added exhaust fan control on 6F |
2018.11.30 ■Added exhaust fan control on 1F |
2021.3.9 ■B1F air compressor cooling water system |
2021.3.12 ■Water pump control |
2021.5.19 ■Two air conditioning boxes and two ice water pumps on the top floor of the new system |
2021.7.21 ■Dry and Wet Exhaust Fan System |
2021.9.24 ■Meter communication ■Air compressor communication ■Dryer, BI points |
2022.3.21 ■Replacement of PCWP-1 and 2 on B side of 1F |
2022.3.30 ■4 cooling towers (CT-3-1~4) |
2022.7.19 ■Continuous maintenance |
2022.11.11 ■Vacuum machine communication connection ■Vacuum machine state tripping dry contact |
其他相關案例
Hsinchu Biomedical product development center
Service Time: 2013 (Continuing Service)
Place: Hsinchu
SinPhar Medical Group - Building B
Service Time: 2009 (Continuing Service)
Place: Yilan
Linkou Power Plant
Service Time: 2013 (Continuing Service)
Place: New Taipei City
Kingcar-Yuanshan
Service Time: 2006 (Continuing Service)
Place: Yilan
Taiwan Advance Composite Center Factory
Service Time: 2009 (Continuing Service)
Place: Taichung
Agricultural Biotechnology Park Preparatory Office
Service Time: 2009 (Continuing Service)
Place: Ping tung
Arcadyan Technology Corporation
Completion Time: 2012 (Continuing Service)
Place: Hsinchu
Sheng Chang Pharmaceutical Co.
Service Time: 2006 (Continuing Service)
Place: Chungli